久久久久久噜噜噜久久久精品-久久久久久久综合日本亚洲-久久久久久久综合狠狠综合-久久久久久久影院-午夜精品一区-午夜精品亚洲

E-Mail: sale@zsshili.com | Hotline:0760-22601408
Home > News >>  News center
Automatic winding machine inspection before the operation
Date:2019-09-24 08:14:38 Click:
 

Frist, fully automatic winding machine, winding machine and auxiliary equipment inspection and maintenance

1. Inspection and maintenance of horizontal winding machine

1) Always check the lubrication of all moving parts, ensure good lubrication.

2) Always check all parts of fastening bolts loose to timely discovery tightened, especially tailstock foot bolts must be solid and reliable.

3) when the machine is rotated, the following operation is not allowed in the winding.

4) work, always check the disk, whether the top bend and fracture phenomena tailstock, identify problems and timely repairs.

5) when the machine is rotated, does not allow for commutation, speed shift and other operations.

2. Inspection and maintenance of vertical winding machine

1) Check the winding machine and winding butted whether faceplate bolts have been tightened, otherwise it must be re-tightened.

 2) Power Winder is damaged, such as insecurity, if it should be ruled out.

3) Check the telescopic retractable cover is good, and adjust the size of the opening and closing the distance to the faceplate or wound around the outer diameter of the winding 150ram, in order to ensure safe operation. Around

4) Check whether the strap winder or interfere with the operation of the tooling or other objects, or should be arranged in line reconnection position tray and other tooling objects.

The above content after check, can start winding machine winding operation.

SecondInspection and maintenance of winding clamping machine and the assembled rack.

1) Lift the system is working properly, if there is stuck, tilted fault stall or unsafe factors, should ask the professionals repair and eliminate insecurity.

2) the electrical part of the power and the shield is damaged, such as insecurity exists, if it should be excluded.

3) whether winding center clamping mechanism on the positive, otherwise the response is positive.

4) Whether the operator, starting compactors, the following person is not allowed to stand at compactor.

5) hydraulic compactor must check the pressure gauge is within the period of use, the reading is correct, whether hydraulic station is working properly, the hydraulic oil is adequate, or should be ruled out before use.


Automatic winding machine inspection before the operation

 

 

Previous:Lubrication Winder equipment

Next:Winder started when matters must be noted

主站蜘蛛池模板: 亚洲 欧美 成人日韩 | 日韩乱码视频 | 日韩久久综合 | 人人看人人爱 | 欧美又粗又硬又大久久久 | 日韩美女在线视频网站免费观看 | 亚洲涩色| 五月天色丁香 | 中文字幕一区二区三区四区五区人 | 亚洲免费成人网 | 青春草在线免费视频 | 欧美系列在线观看 | 亚洲影视精品 | 在线看片日本 | 亚洲国产成人精品区 | 在线视频一区二区 | 欧美五月婷婷 | 日韩一区二区中文字幕 | 日日射天天射 | 五月激激激综合网色播胖胖 | 探花视频免费观看高清 | 日本视频一区在线观看免费 | 性高湖久久久久久久久 | 一级十八以 下岁女子毛片 一级人做人爰a全过程免费视频 | 日韩欧美亚洲综合 | 婷婷六月久久综合丁香乐透 | 外国毛片视频 | 亚洲欧洲日本在线观看 | 亚洲国产系列久久精品99人人 | 欧美视频免费 | 青青草 久久久 | 欧美一级做一a做片性视频 欧美一级做性受 | 日本人的一区二区三区四区 | 午夜在线影院 | 欧美一区二区三区不卡 | 夜色1网站 | 中文字幕在亚洲第一在线 | 亚洲福利影视 | 天天躁狠狠躁夜躁2021 | 亚洲国产欧美在线人成精品一区二区 | 青草视频.com |