Specification for safe operation of CNC winding machine
Date:2019-12-17 08:47:37 Click:
 

In order to guide the use of the equipment to the correct operation of CNC winding machine, to prevent improper operation caused by the safety accident, so that the equipment to maintain good running state, and to develop the following rules:

One week inspection:

1, check the power supply internal connection wire is loose, wire insulation glue whether scratch or broken exposed copper core wire;

2, check whether the power supply voltage of CNC winding machine is 220V + 10V;

3, check the automatic upper and lower material cylinder SENSOR line and trachea whether or not broken or clip, indicating lamp state;

4, check the automatic upper and lower material protection cover is normal;

5, check whether the automatic upper and lower material expansion is normal;

6. Check the safety cover of the CNC winding machine to start the switch;

7, check the CNC winding machine to stop the switch function is normal, whether the emergency stop switch can be locked, indicating the state of light;

8, check the teaching box on the key functions are normal;

9, check whether the CNC winding machine tension device is normal;

10 checking whether the safety protection cover of the feeding area on the automatic feeding machine is normal.

Two, note:

1, the adjustment machine personnel must pass through the specialized training examination qualified, is familiar with the adjustment machine rule and the maintenance skill;

2, before the machine will teach the box to stop the switch to press the lock, press the rules of the machine operation;

3, hold down the button box to teach is not more than 1SEC at a time, to prevent a needle frame collision fixture;

4, fault repair must be the teaching box and the switch on the panel to stop switch on (Hong Dengliang);

Must confirm the guide needle frame at 90 degrees 5, boot before returning;

6, around the line staff must be the hair before the hair in the anti - static cap, not to reveal the forehead hair;

7, the seat on the designated line within the body, and the winding shaft distance 40cm minimum, may not be resting on the table;

8, when the winding hands to lift the work, when necessary, the hand can be placed in the middle of the material box position, hand can not be placed on the upper and lower cylinder up and down, before and after, flip the gap, to prevent the injury of the hand;

9, wear line must be a quick stop switch on the panel to open, after confirmation of the red light, it can be carried out in line operation;

10, clean the waste wire must be on the front of the emergency stop switch on the panel to confirm the red light, can be carried out;

11, automatic feeding must check whether the material feeding machine tool before operation, if there is a need to take the material before starting materials;

12, machine failure, the staff can not be allowed to handle, must be notified to the mechanic repair, and indicate the state of failure.

 

Specification for safe operation of CNC winding machine

 

Previous:Development of production technology of CNC winding machine

Next:The rational use and maintenance of CNC winding machine

主站蜘蛛池模板: 午夜国产精品理论片久久影院 | 视频在线精品 | 色网站观看 | 色网站免费观看 | 亚洲在成人网在线看 | 日韩在线精品视频 | 亚洲激情欧美 | 青娱乐成人| 在线看欧美日韩中文字幕 | 日本tv欧美tv天堂 | 欧美亚洲日本在线 | 日本最新免费二区 | 午夜剧院免费 | 中文字幕视频免费在线观看 | 四虎免费大片aⅴ入口 | 日本精品欧洲www | 四月激情网 | 伊人久久中文大香线蕉综合 | 亚洲天堂手机在线 | 四虎国产成人免费观看 | 亚洲欧洲日韩在线 | 日本美女久久 | 青青国产成人久久激情91麻豆 | 天天看片日日夜夜 | 婷婷三级 | 中文字幕天堂最新版在线网 | 亚洲成a人v欧美综合天 | 日韩在线黄色 | 日日摸夜夜添夜夜添影院视频 | 五月婷婷丁香 | 中文字幕成人免费视频 | 网络色综合久久 | 亚洲视频一二区 | 在线观看视频一区二区 | 亚洲视色| 亚洲免费观看视频 | 青青色综合| 片成年免费观看网站黄 | 一级黄色免费观看 | 日韩性视频 | 人人草人人看 |