久久久久久噜噜噜久久久精品-久久久久久久综合日本亚洲-久久久久久久综合狠狠综合-久久久久久久影院-午夜精品一区-午夜精品亚洲

E-Mail: sale@zsshili.com | Hotline:0760-22601408
Home > News >>  News center
Specification for safe operation of CNC winding machine
Date:2019-12-17 08:47:37 Click:
 

In order to guide the use of the equipment to the correct operation of CNC winding machine, to prevent improper operation caused by the safety accident, so that the equipment to maintain good running state, and to develop the following rules:

One week inspection:

1, check the power supply internal connection wire is loose, wire insulation glue whether scratch or broken exposed copper core wire;

2, check whether the power supply voltage of CNC winding machine is 220V + 10V;

3, check the automatic upper and lower material cylinder SENSOR line and trachea whether or not broken or clip, indicating lamp state;

4, check the automatic upper and lower material protection cover is normal;

5, check whether the automatic upper and lower material expansion is normal;

6. Check the safety cover of the CNC winding machine to start the switch;

7, check the CNC winding machine to stop the switch function is normal, whether the emergency stop switch can be locked, indicating the state of light;

8, check the teaching box on the key functions are normal;

9, check whether the CNC winding machine tension device is normal;

10 checking whether the safety protection cover of the feeding area on the automatic feeding machine is normal.

Two, note:

1, the adjustment machine personnel must pass through the specialized training examination qualified, is familiar with the adjustment machine rule and the maintenance skill;

2, before the machine will teach the box to stop the switch to press the lock, press the rules of the machine operation;

3, hold down the button box to teach is not more than 1SEC at a time, to prevent a needle frame collision fixture;

4, fault repair must be the teaching box and the switch on the panel to stop switch on (Hong Dengliang);

Must confirm the guide needle frame at 90 degrees 5, boot before returning;

6, around the line staff must be the hair before the hair in the anti - static cap, not to reveal the forehead hair;

7, the seat on the designated line within the body, and the winding shaft distance 40cm minimum, may not be resting on the table;

8, when the winding hands to lift the work, when necessary, the hand can be placed in the middle of the material box position, hand can not be placed on the upper and lower cylinder up and down, before and after, flip the gap, to prevent the injury of the hand;

9, wear line must be a quick stop switch on the panel to open, after confirmation of the red light, it can be carried out in line operation;

10, clean the waste wire must be on the front of the emergency stop switch on the panel to confirm the red light, can be carried out;

11, automatic feeding must check whether the material feeding machine tool before operation, if there is a need to take the material before starting materials;

12, machine failure, the staff can not be allowed to handle, must be notified to the mechanic repair, and indicate the state of failure.

 

Specification for safe operation of CNC winding machine

 

Previous:Development of production technology of CNC winding machine

Next:The rational use and maintenance of CNC winding machine

主站蜘蛛池模板: 喷白浆视频| 午夜噜噜噜| 日本丰满bbb| 在线亚洲精品防屏蔽 | 天天躁夜夜躁狠狠躁躁 | 欧美亚洲另类图片 | 天天看片日日夜夜 | 在线看亚洲 | 最新国产网站 | 亚洲精品欧美在线 | 一级香蕉视频在线观看 | 中文字幕在线精品视频入口一区 | 日韩我不卡 | 香蕉在线观看999 | 色猫av| 日本人妖在线观看 | 亚洲成a人片77777老司机 | 亚洲成a人v| 午夜大片免费完整在线看 | 伊人影院在线观看 | 四只虎免费永久观看地址 | 日韩成人精品 | 日韩成人免费 | 亚洲欧美中文日韩v在线观看 | 求欧美精品网址 | 伊人狼人综合网 | 亚洲高清在线视频 | 四虎永久在线日韩精品观看 | 午夜激情视频 | 天堂网男人 | 日韩成人在线观看 | 日韩免费看片 | 欧美一区二区三区四区在线观看 | 欧美一区二区三区在观看 | 欧美亚洲国产日韩综合在线播放 | 欧美亚洲视频 | 日韩欧美视频一区 | 日本无卡码免费一区二区三区 | 宇都宫紫苑日韩专区亚洲 | 四虎影视国产精品永久在线 | 日韩亚洲欧美一区二区三区 |